| |
| ABOUT SRS GROUP |
|
The seeds of success of the SRS Group were sown in the year 1990,
when Dr Jindal organized his finance business and incorporated
Bansla Finlease Ltd. In the year 1997, it diversified its business
and entered into manufacturing and marketing of Edible Oil & Tea
and for this purpose floated two new companies BTL Industries Ltd.
and BTL Commercial Ltd. By then, the group had gained recognition
and become famous as BTL Group. In the year 2000, the group took a
quantum leap and entered the retail, real estate, cinemas food
court businesses sectors that were on the upswing and in sync with
the emerging needs of the masses. This was the new beginning of the
group, and paved way for SRS Entertainment & Retail Ltd., the
flagship company of SRS Group. With the launch of SRS Multiplex in
2004 at City Centre, Faridabad, the whole outlook of the group
changed. It became the beacon for change, growth and expansion and
started chartering the group�s foray into new geographies and
businesses.
|
| Top |
| |
| |
| ABOUT SRS ROYAL HILLS |
|
SRS has launched new residential project Royal Hills
in Sector 87 in Greater Faridabad. SRS Royal Hills is
best in class amenities with the gated environment. Royal Hills
offers you space efficient 3 bedroom independent
floors with the excellent amenities such as park, school, hospital
and more. Located at Sector - 87, Faridabad, SRS Royal Hills is new
age housing project that is designed to give you the houseof your
dream.
|
| Top |
| |
| SRS ROYAL HILLS: GENERAL INFORMATION |
- Location: Sector-87, Greater Faridabad
- Part of 46 Acres self-sufficient integrated residency
- Unit Type: 2 BHK and 3 BHK
- Sizes: 1025 Sq. Ft to 1650 Sq. Ft.
- Category: Basic
- Structure: Multi-Storeyed
- Status: Under Construction
- Completion:December, 2012
- Home Loan: Upto 80%
- Architect: -----
|
| Top |
| |
| SRS ROYAL HILLS: PROJECT SPECIFICATION |
-
Floorings:
- Master Bedroom: Wooden Laminated flooring with matching skirting
- Other Rooms: Marble Stone / Vitrified ceramic tiles with matching skirting
- Balconies: Anti-skid tiles with matching skirting
-
Walls and Ceiling:
- Bedrooms / Drawing / Dining & Lobby: Oil Bound distemper
-
Cup Boards:
- Master Bedrooms / Other Rooms: Provision without wood work
-
Doors and Windows:
- Internal Frame: Painted hard wood frames with flush door shutter
- Entrance Door: Polished molded paneled shutters
- Windows: Frame of hard wood with wooden shutters with glass, fitting and fixed glass etc.
-
Toilets:
- Walls: combination of glazed tiles upto 7' height and oil bound distemper
- Floors: Anti-skid tiles
- Counters: Polished marble stone
- Fittings / Fixtures: White vitreous chinaware English W.C. with low level cistern, wash basin
-
Kitchen
- Walls: Ceramic tiles up to 2' above working counter and OBD.
- Floors: Anti-skid tiles
- Counters: Pre Polished Black Granite
- Fittings / Fixtures: Stainless steel sink with drain board and C.P. Fittings
-
External Finishes: Plastered finish in weather proof texture pain in pleasing shades.
-
Electrical Works:
- Electrical work with multi strand copper wiring in concealed PVC Conduits.
- Sufficient light and power points in semi-modular series
-
Power Backup: 100% electrical power backup for common areas i.e., lifts, street lights adn parking areas etc.
-
Water supply: Water supply in GI/PPR fittings in toilets and kitchen through overhead water tank.
-
Security and Fire System: CCTV gadgets giving round the clock view of complex main gate and fire fighting system as per fire norms.
- Connectivity: T.V. and telephone points
-
Eco-friendly green environment:
- Well detailed Parks for Kids
- Sitting & Recreational Area
- Jogging and Walking Tracks
-
Other features:
- Express lifts
- Earthquake Resistant RCC Framed Structure
- Convenient Shopping Centre inside the Complex
- Wide & illuminated Roads
- Environment friendly Waste Disposal & Water Harvesting System
- Club House with Swimming Pool
- State-of-the-Art Security System
- Power Backup
- Water Supply
Note: Architect and Developer reserve the right to alter the specifications and facilities
|
| Top |
| |
| SRS RORAL HILLS: CONNECTIVITY |
|
Faridabad Connectivity:Badarpur Flyover under Construction | 6-Lane bypass road starting from Badarpur Border to New Faridabad is under construction | NHAI has started Process of Widening of NH-2 to a 6-Lane Expressway all the way to Agra | Eastern Peripheral Expressway to be completed by 2010 connecting Faridabad with Noida, G.Noida & Ghaziabad | Work Started for Faridabad-Gurgaon Expressway and Faridabad-Sohna-Gurgaon Expressway | Metro Connectivity till Badarpur by September 2010, expected till Faridabad by 2012
|
| Top |
| |
| SRS ROYAL HILLS: PRICE LIST |
|
|
| Top |
| |
| Disclaimer |
|
All the information given here here is only for informational purpose.
|
| Top |
| |